Wind Turbine Components

For this renewables project, we managed the transport of wind turbine components from China to Rotterdam. The cargo had a total volume of 3,818 FRT and required careful coordination across several transport modes and operational interfaces. Our scope included technical preparation, sea fastening, pre-carriage, intermediate storage, road transport, sea freight, part-charter shipping, transshipment, port handling and barge transport. With a strong control tower setup and close coordination between all involved parties, we ensured a smooth and reliable transport process for this renewable energy shipment.

PICK UP LOCATION:

China

DESTINATION:

Netherlands

Cargo

Wind Turbine Components

INDUSTRY
Renewables

SCOPE OF WORK
Technical Inspection, Sea Fastening Concept & Execution, Control Tower, Pre-Carriage, Intermediate Storage, Road Transport, Sea Freight, Part-Charter Shipping, Transshipment, Port Operations & Handling, Transport by Barge

TIME OF SHIPMENT
December 2025

VOLUME
3,818 FRT

Share

Contact

Nicolo Bianchi
Chartering
t.
m.
e.
+49 421 807 182 66
+49 171 908 06 99
n.bianchi@bremer-lloyd.com
Jessica Remien
Charterin Manager
t.
e.

+49 421 80715662
j.remien@bremer-lloyd.com