LNG TANKS

For this marine engineering project, two large-scale LNG fuel tank sets were delivered to Philadelphia Shipyard in the USA. Each unit required careful heavy-lift planning due to its exceptional dimensions and single weight of 305 tons. The operational scope started directly at the shipyard dock, where the tanks were picked up by barge and transferred to Taicang Port for export handling. A key success factor was the early preparation: customs declaration was completed one week in advance, and the barge stowage plan was finalized before execution. This allowed the team to ensure a smooth transport flow and precise coordination throughout the heavy-lift operation.

PICK UP LOCATION:

Nantong, China

DESTINATION:

Philadelphia, USA

Cargo

LNG tanks

INDUSTRY
Marine Engineering

SCOPE OF WORK
Technical inspection, pre-carriage, export customs clearance, port operations & handling, barge transport

TIME OF SHIPMENT
April – May 2026

VOLUME
10,796 RT / 610,000 kg / 10,796 CBM

Share

Contact

Nicolo Bianchi
Chartering
t.
m.
e.
+49 421 807 182 66
+49 171 908 06 99
n.bianchi@bremer-lloyd.com
Jessica Remien
Charterin Manager
t.
e.

+49 421 80715662
j.remien@bremer-lloyd.com