Converter System Transport

For this steel industry project, we coordinated the transport of a 300-ton converter and a 155-ton vessel from Avilés, Spain to Detroit, USA. The cargo required a tailor-made logistics concept, combining engineering, transport planning and international coordination. Due to the weight and dimensions of the units, the project demanded careful preparation, technical inspection, method statement development and sea fastening execution. Our scope included pre-carriage, part-charter shipping and full operational coordination from origin to destination. With precise planning and strong communication between all involved parties, we ensured the successful delivery of this heavy industrial cargo to the United States.

PICK UP LOCATION:

Avilés, Spain

DESTINATION:

Detroit, USA

Cargo

Vessel Converter System & Trunnion Ring Arrangement

INDUSTRY
Steel Industry

SCOPE OF WORK
Technical Inspection, Method Statement, Sea Fastening Concept & Execution, Control Tower, Pre-Carriage, Part-Charter Shipping

TIME OF SHIPMENT
April 2019

VOLUME
2,300 FRT

Share

Contact

Nicolo Bianchi
Chartering
t.
m.
e.
+49 421 807 182 66
+49 171 908 06 99
n.bianchi@bremer-lloyd.com
Jessica Remien
Charterin Manager
t.
e.

+49 421 80715662
j.remien@bremer-lloyd.com