Industrial Equipment 

From the heart of Europe, a meticulously engineered transport journey unfolded. Departing from Mělník in the Czech Republic, this river freight operation set sail along the waterway to Hamburg for transhipping seamlessly onto a coaster vessel for the next leg up to Avilés in Spain. Due to height restrictions, an auxiliary temporary bypass was built for ensuring no delays with the free pass beneath a viaduct. Finally and once at the destination, a heavy-duty crane delivered the cargo to its exact destination.

PICK UP LOCATION:

Mělník, Czech Republic

DESTINATION:

Avilés, Spain

Cargo

Mobile Boiler

INDUSTRY
Steel

SCOPE OF WORK
Sea Fastening Concept & Execution, Control Tower, Method Statement, Pre Carriage, Transport by Barge, Part – Charter Shipping, Port Operations & Handling, Construction of by-pass for Road Transport, Setting onto Foundations

TIME OF SHIPMENT
2024

VOLUME
400 FRT

Share

Contact

Nicolo Bianchi
Chartering
t.
m.
e.
+49 421 807 182 66
+49 171 908 06 99
n.bianchi@bremer-lloyd.com
Jessica Remien
Charterin Manager
t.
e.

+49 421 80715662
j.remien@bremer-lloyd.com